
Resort entrance
The reception forecourt will be extended and resurfaced in spring 2023 (from 17. April 2023 till Whitsun). A new waste disposal point will also be built in front of the "Sonnenhof" sanitary building. Noise pollution may occur here between 7.00 am and 7.00 pm due to the construction work. The access road will also be temporarily closed.
At the same time the space around the new "Kraftreich Aufenfeld" will be resurfaced. In addition, the new skate ramp is being built here and it should be in operation from Whitsun.